Well done to our operatives for carrying out this night job working for ISG Retail. We were required to saw cut the screed/concrete floor into manageable segments, which would then be lifted and removed by an A Frame. The floor was to be reinforced to make way for heavy duty freezers.

Brent Cross Shopping Centre

We are proud of the work we completed for ISG Retail at Brent Cross Shopping Centre, where we carried out controlled demolition, removing the floor beams without disruption to the surrounding shopping centre.

Rochester Cathedral

We have had the pleasure of working on the Historic Rochester Cathedral which has been around since 604AD based local to us here in Kent.

We have been diamond drilling holes through the purbeck stone floor for a new lighting system to be installed. Here are some of the photos below.

Redhall Nuclear Limited – Dungeness B, Nuclear Power Station

Stitch drilling a 1280mm diameter opening through a 1680mm thick heavily reinforced retaining wall. The opening was drilled into two sections and removed by an excavator, each weighing 2.5 Tonnes.